	{"id":54741,"date":"2026-07-17T14:29:40","date_gmt":"2026-07-17T12:29:40","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=54741"},"modified":"2026-07-23T09:19:08","modified_gmt":"2026-07-23T07:19:08","slug":"key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/","title":{"rendered":"Key activities carried out in the first half of the year at the Port of Bilbao"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><ul>\n<li>The Energy Transition Plan is progressing with the completion of the first phase of dock electrification, which will significantly reduce noise and CO2 emission levels of vessels calling at the port.<\/li>\n<li>The new European Union Entry and Exit System has been implemented<\/li>\n<\/ul>\n<div class=\"one_half bbcol\">\n<p>Planned investment for the 2026 financial year amounts to 87.1 million euros, 48% of which had already been spent as at 30 June. The Business Plan provides for a total planned investment for the period 2026\u20132030 of 308.8 million. The main actions carried out in the first half of the year are:<\/p>\n<ol>\n<li><strong>Roll-out of the Energy Transition Plan<\/strong><\/li>\n<\/ol>\n<p>The Port Authority continues to roll out its Energy Transition Plan, a key element of which is the project to electrify the docks using an OPS (Onshore Power Supply) system. This will enable vessels to connect to the electricity grid and switch off their auxiliary engines whilst in port, significantly reducing noise and CO<sub>2<\/sub> emission levels. The first phase of the project, which began at the end of 2023 and has been focused on Dock A5 of the central breakwater, was completed in May. Investment has totalled 4.5 million euros, with a grant of 3.9 million from the Recovery, Transformation and Resilience Plan \u2013 NextGenerationEU.<\/p>\n<p>The second phase, awarded in April 2025 and due to be completed in 2027, is focused on Docks A1, A2, A6 and AZ3, and at the Getxo cruise ship terminals, to cater for container, ro-pax, ro-ro and cruise ship traffic. These works require an investment of 50.1 million euros and are part-funded by the European Commission through the CEF (Connecting Europe Facility) programme, the Recovery, Transformation and Resilience Plan \u2013 NextGenerationEU and the EIB (European Investment Bank). The OPS project will make the Port of Bilbao the first port on the Atlantic corridor to have all its docks electrified, ahead of EU requirements for 2030 and reaffirming the port\u2019s commitment to sustainability and the energy transition. In the case of cruise ships, this could potentially mean a reduction in emissions of up to 95% whilst the vessels are berthed in the port.<\/p>\n<p>Furthermore, to ensure that the energy consumed by connected vessels comes from renewable sources, the Port Authority is installing arrays of PV solar panels and is planning a future wind power project. The total investment in these projects, provided for within the Energy Transition Plan, will exceed 119 million euros.<\/p>\n<p>At the same time, the Port Authority continues to implement measures to reduce CO<sub>2<\/sub> emissions associated with its operations (fixed installations, electricity consumption, cooling and transport). These have been reduced by 72% over the last five years. In addition to this, between 2020 and 2025, air quality has remained within legal limits at all monitoring stations. PM10 particle levels, meanwhile, have been falling, reflecting a positive trend in air quality.<\/p>\n<p>The Port of Bilbao has been and continues to be a benchmark for sustainability amongst European ports. For example, 15 February this year marked the twentieth anniversary of the inauguration of the port\u2019s wind farm, consisting of five wind turbines, the first of its kind amongst all ports in Spain.<\/p>\n<ol start=\"2\">\n<li><strong>Second phase of works on the central breakwater <\/strong><\/li>\n<\/ol>\n<p>Construction work on the second phase of the central breakwater, which began in the last quarter of 2024, is progressing at a good pace. With a budget of around 55 million, the project involves the creation of 1,011 metres of new berthing line spread across two new docks (A3 and A4), set to provide an additional port surface area of approximately 310,000 m\u00b2.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<p><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2026\/07\/espigon-central-Puerto-de-Bilbao.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"thickbox alignnone wp-image-54295 size-full\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2026\/07\/espigon-central-Puerto-de-Bilbao.jpg\" alt=\"\" width=\"1200\" height=\"792\" \/><\/a><\/p>\n<p>To do so, 15 reinforced concrete caissons have been built, anchored and backfilled, and work is currently underway on the rock-filled embankment behind the caissons. The first phase has commenced with the concreting of the rear beam, while the formwork traveller is being assembled in preparation for the forthcoming construction of the edge beam of the new berthing line.<\/p>\n<ol>\n<li><strong>Roll-out of the EES<\/strong><\/li>\n<\/ol>\n<p>The Port Authority has deployed the EU Entry\/Exit System (EES) at the ferry terminal in Zierbena and at the two cruise ship terminals in Getxo. The EES is a centralised European Union information system that electronically records every entry and exit of travellers from non-EU countries, replacing the manual passport stamp with a digital record. Investment has exceeded 7.1 million, of which 3.6 million is subsidised by the EU.<\/p>\n<ol start=\"2\">\n<li><strong>New building for the Vessel Operations Department <\/strong><\/li>\n<\/ol>\n<p>Work is currently underway on the new building, at a cost of 1,079,384 euros, designed to house staff from the Vessel Operations Department. The building is due to be completed in spring 2027.<\/p>\n<ol start=\"3\">\n<li><strong>Upgrades to refrigeration equipment<\/strong><\/li>\n<\/ol>\n<p>Bilbao is one of the ports authorised by the European Union to have a Border Control Post (BCP), where the Border Inspection Services conduct sanitary, phytosanitary, veterinary and quality inspections, with a view to ensuring that products from third countries, whether intended for human or non-human consumption, enter the EU market with the appropriate and necessary guarantees.<\/p>\n<p>The Bilbao Container Terminal is at the forefront of Spanish ports. Between 2025 and May 2026, the Port Authority has invested 1,390,864 euros in improvements to the building, including the replacement of the refrigeration systems in the cold stores and at the loading bays, and new laboratories to house SOIVRE. The works were completed on 26 May, and investment this financial year exceeds 600,000 euros.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: Key activities carried out in the first half of the year at the Port of Bilbao - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-port-authority-maintains-its-economic-and-financial-stability\/\" rel=\"prev\">The Port Authority maintains its economic and financial stability<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-port-of-bilbao-welcomes-the-largest-container-ship-ever-to-call-at-its-facilities\/\" rel=\"next\">The Port of Bilbao welcomes the largest container ship ever to call at its facilities<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao The Energy Transition Plan is progressing with the completion of the first phase of dock electrification, which will significantly reduce noise and CO2 emission levels of vessels calling at the port. The [&hellip;]<\/p>\n","protected":false},"author":4068,"featured_media":54664,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[15],"tags":[],"class_list":["post-54741","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Key activities carried out in the first half of the year at the Port of Bilbao - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Key activities carried out in the first half of the year at the Port of Bilbao - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao The Energy Transition Plan is progressing with the completion of the first phase of dock electrification, which will significantly reduce noise and CO2 emission levels of vessels calling at the port. The [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-17T12:29:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-23T07:19:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2026\/07\/espigon-central-Puerto-de-Bilbao-1200x800.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#\\\/schema\\\/person\\\/1d11de2f1ee0b3dd8f67eda598a40f83\"},\"headline\":\"Key activities carried out in the first half of the year at the Port of Bilbao\",\"datePublished\":\"2026-07-17T12:29:40+00:00\",\"dateModified\":\"2026-07-23T07:19:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/\"},\"wordCount\":880,\"publisher\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bilbaoport.eus\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/espigon-central-Puerto-de-Bilbao.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/\",\"url\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/\",\"name\":\"Key activities carried out in the first half of the year at the Port of Bilbao - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bilbaoport.eus\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/espigon-central-Puerto-de-Bilbao.jpg\",\"datePublished\":\"2026-07-17T12:29:40+00:00\",\"dateModified\":\"2026-07-23T07:19:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.bilbaoport.eus\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/espigon-central-Puerto-de-Bilbao.jpg\",\"contentUrl\":\"https:\\\/\\\/www.bilbaoport.eus\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/espigon-central-Puerto-de-Bilbao.jpg\",\"width\":6144,\"height\":4096,\"caption\":\"default\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/news\\\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Key activities carried out in the first half of the year at the Port of Bilbao\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.bilbaoport.eus\\\/wp-content\\\/uploads\\\/2014\\\/09\\\/logo_bilbaoport.png\",\"contentUrl\":\"https:\\\/\\\/www.bilbaoport.eus\\\/wp-content\\\/uploads\\\/2014\\\/09\\\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/bilbaoport\",\"https:\\\/\\\/x.com\\\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/#\\\/schema\\\/person\\\/1d11de2f1ee0b3dd8f67eda598a40f83\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"description\":\"Usuario de Bilbaoport\",\"url\":\"https:\\\/\\\/www.bilbaoport.eus\\\/en\\\/author\\\/izaskun-gomez-sanchez\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Key activities carried out in the first half of the year at the Port of Bilbao - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/","og_locale":"en_US","og_type":"article","og_title":"Key activities carried out in the first half of the year at the Port of Bilbao - Port of Bilbao","og_description":"Port of Bilbao The Energy Transition Plan is progressing with the completion of the first phase of dock electrification, which will significantly reduce noise and CO2 emission levels of vessels calling at the port. The [&hellip;]","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2026-07-17T12:29:40+00:00","article_modified_time":"2026-07-23T07:19:08+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2026\/07\/espigon-central-Puerto-de-Bilbao-1200x800.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83"},"headline":"Key activities carried out in the first half of the year at the Port of Bilbao","datePublished":"2026-07-17T12:29:40+00:00","dateModified":"2026-07-23T07:19:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/"},"wordCount":880,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2026\/07\/espigon-central-Puerto-de-Bilbao.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/","name":"Key activities carried out in the first half of the year at the Port of Bilbao - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2026\/07\/espigon-central-Puerto-de-Bilbao.jpg","datePublished":"2026-07-17T12:29:40+00:00","dateModified":"2026-07-23T07:19:08+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2026\/07\/espigon-central-Puerto-de-Bilbao.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2026\/07\/espigon-central-Puerto-de-Bilbao.jpg","width":6144,"height":4096,"caption":"default"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/key-activities-carried-out-in-the-first-half-of-the-year-at-the-port-of-bilbao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"Key activities carried out in the first half of the year at the Port of Bilbao"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g","caption":"Bilbaoport"},"description":"Usuario de Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/author\/izaskun-gomez-sanchez\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/54741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/4068"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=54741"}],"version-history":[{"count":1,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/54741\/revisions"}],"predecessor-version":[{"id":54742,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/54741\/revisions\/54742"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/54664"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=54741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=54741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=54741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}