	{"id":51513,"date":"2024-12-10T10:59:06","date_gmt":"2024-12-10T09:59:06","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=51513"},"modified":"2024-12-11T07:57:07","modified_gmt":"2024-12-11T06:57:07","slug":"the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/","title":{"rendered":"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p>The Bilbao Port Authority has put out to tender, for 55.4 million euros, the works for the second phase of its OPS (Onshore Power Supply) project so that vessels can connect to the power grid when berthed, thereby reducing fuel consumption and gas emissions and minimising noise and vibration levels. The works are scheduled to take 24 months to complete and the deadline for submitting proposals is 31 January.<\/p>\n<p>The project, referred to as BilbOPS, is financed by the Bilbao Port Authority and has been awarded a 14.2 million euro grant by the European Commission under the CEF Transport 2021-2027 funding programme. These works form part of the Port&#8217;s Energy Transition Plan and are also provided for under the objectives of the 2023-26 Strategy Plan to be a green port that drives and supports companies on the road to sustainability.<\/p>\n<p>This second phase of electrification, the most important and ambitious of the two phases, will be undertaken on Docks A1, A2, A6, AZ3, Getxo 2 and 3, or, more specifically, the ferry and Ro-Pax terminal, the terminal for Ro-Ro traffic, the container terminal and the three cruise ship berths. As the works will require the power lines to be upgraded for the facilities to provide 30 MW of power, three distribution centres, 11 transformation centres and 11 OPS connection points will be set up on the docks. To maximise the flexibility of the infrastructure, 20 power sockets will also be provided to serve the quayside regardless of where the ships are berthed. To increase the power supply to the cruise ship docks, a 1.34 kilometre subsea cable will be run from Santurtzi.<\/p>\n<p>The entire OPS network will be powered by renewable energy, such as PV solar panels distributed over four arrays in different areas of the port, providing 4.25 MWp. The first phase of the electrification of the docks, awarded in December 2023 and focused on Dock A5 of the Central Breakwater of the expansion area, will require an investment of 4.7 million euros, with a grant of 4.3 million euros from the Recovery and Resilience Facility. The new facility is expected to be operational in the first quarter of 2026.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_51506\" aria-describedby=\"caption-attachment-51506\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"thickbox wp-image-51506 size-full\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg\" alt=\"Barcos en puerto de Bilbao\" width=\"1200\" height=\"800\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421-535x357.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421-150x100.jpg 150w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-51506\" class=\"wp-caption-text\">Bilbao Port<\/figcaption><\/figure>\n<p><strong>International recognition <\/strong><\/p>\n<p>In its report presented recently at the COP29 Climate Summit held in Azerbaijan, the <a href=\"https:\/\/sustainability-coalition.org\/\">Resilience4Ports<\/a>initiative, led by the <a href=\"https:\/\/cdri.world\/\">International Coalition for Sustainable Infrastructure (ICSI), the global movement for engineering action on infrastructure sustainability, resilience and climate change, has recently recognised the<\/a> <a href=\"https:\/\/bilbops.bilbaoport.eus\/\">BilbOPS<\/a> project for its objective of increasing the resilience of natural ecosystems and energy generation.<\/p>\n<p>The report details the work that the Port of Bilbao has actively been doing to improve its resilience and adaptation to climate change, focusing on both environmental sustainability and biodiversity.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-unmistakable-style-of-the-photographer-manuel-torcida-to-grace-the-now-traditional-calendar-of-the-port-of-bilbao\/\" rel=\"prev\">The unmistakable style of the photographer Manuel Torcida to grace the now traditional calendar of the Port of Bilbao<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/registration-open-to-attend-the-ii-international-sustainable-port-conference\/\" rel=\"next\">Registration open to attend the II International Sustainable Port Conference<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorThe unmistakable style of the photographer Manuel Torcida to grace the now traditional calendar of the Port of BilbaoSiguienteRegistration open to attend the II International Sustainable Port Conference<\/p>\n","protected":false},"author":4068,"featured_media":51508,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-51513","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorThe unmistakable style of the photographer Manuel Torcida to grace the now traditional calendar of the Port of BilbaoSiguienteRegistration open to attend the II International Sustainable Port Conference\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-10T09:59:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-11T06:57:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83\"},\"headline\":\"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks\",\"datePublished\":\"2024-12-10T09:59:06+00:00\",\"dateModified\":\"2024-12-11T06:57:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/\"},\"wordCount\":474,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/\",\"name\":\"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg\",\"datePublished\":\"2024-12-10T09:59:06+00:00\",\"dateModified\":\"2024-12-11T06:57:07+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Instalaciones del Puerto de Bilbao\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"description\":\"Usuario de Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/izaskun-gomez-sanchez\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/","og_locale":"en_US","og_type":"article","og_title":"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks - Port of Bilbao","og_description":"Port of Bilbao AnteriorThe unmistakable style of the photographer Manuel Torcida to grace the now traditional calendar of the Port of BilbaoSiguienteRegistration open to attend the II International Sustainable Port Conference","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2024-12-10T09:59:06+00:00","article_modified_time":"2024-12-11T06:57:07+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83"},"headline":"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks","datePublished":"2024-12-10T09:59:06+00:00","dateModified":"2024-12-11T06:57:07+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/"},"wordCount":474,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/","name":"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg","datePublished":"2024-12-10T09:59:06+00:00","dateModified":"2024-12-11T06:57:07+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9421.jpg","width":1200,"height":800,"caption":"Instalaciones del Puerto de Bilbao"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-bilbao-port-authority-puts-out-to-tender-the-second-phase-of-the-works-for-the-electrification-of-the-docks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"The Bilbao Port Authority puts out to tender the second phase of the works for the electrification of the docks"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g","caption":"Bilbaoport"},"description":"Usuario de Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/author\/izaskun-gomez-sanchez\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/51513","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/4068"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=51513"}],"version-history":[{"count":1,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/51513\/revisions"}],"predecessor-version":[{"id":51514,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/51513\/revisions\/51514"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/51508"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=51513"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=51513"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=51513"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}