	{"id":51425,"date":"2024-12-03T15:15:52","date_gmt":"2024-12-03T14:15:52","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=51425"},"modified":"2024-12-03T15:19:01","modified_gmt":"2024-12-03T14:19:01","slug":"green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/","title":{"rendered":"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><p><strong>The works will mean that the OPS system to be deployed to power vessels at berth will use green energy<\/strong><\/p>\n<p><strong>The aim of the BilbOPS project is to reduce pollutant emission and noise levels from vessels at berth<\/strong><\/p>\n<div class=\"one_half bbcol\">\n<p>The Council of Ministers, at the proposal of the Ministry of Transport and Sustainable Mobility, has given the green light for the 13,045,592.70 euro investment for the engineering project to set up a photovoltaic solar plant to supply electricity to the OPS system of the Port of Bilbao.<\/p>\n<p>These works form part of the BilbOPS project of the Bilbao Port Authority to electrify the docks for onshore power supply, the investment to install the required electrical infrastructure for which was approved by the Council of Ministers on 28 November. The deployment of an OPS system will make it possible for vessels at berth to switch off their auxiliary engines, thereby reducing emission and noise levels.<\/p>\n<p>The power to be supplied to vessels will be of renewable origin, supplied by the distribution company through the port&#8217;s electrical installations or generated by the port&#8217;s own power plants in the port public domain. The objective of the project approved today is to generate electricity using photovoltaic panels spread over four plants in different areas of the port, with a peak power of 4.25 MWp.<\/p>\n<p>Specifically, the project consists of a fixed-structure crystalline technology photovoltaic solar installation divided into four plants on Port of Bilbao premises in the towns of Zierbena, Santurtzi and Getxo. The panels will be installed on the horizontal surfaces of the crown walls of the Santurtzi and Zierbena breakwaters, as well as on the canopies in the ferry and cruise ship terminal car parks.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<p><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"thickbox alignnone wp-image-51418 size-full\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg\" alt=\"Instalaci\u00f3n fotovolt\u00e1ica\" width=\"1200\" height=\"799\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424-535x356.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424-150x100.jpg 150w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><\/p>\n<p>This tender is financed by the Connecting Europe Facility (CEF Funds) and the Bilbao Port Authority itself, provision for which is included in the Port Authority&#8217;s current investment plan 2024-2028, which in turn forms part of the corresponding Business Plan for 2025.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-council-of-ministers-approves-the-electrification-of-the-docks-of-the-port-of-bilbao-for-onshore-power-supply-to-vessels-for-55-million-euros\/\" rel=\"prev\">The Council of Ministers approves the electrification of the docks of the port of Bilbao for onshore power supply to vessels for 55 million euros<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-unmistakable-style-of-the-photographer-manuel-torcida-to-grace-the-now-traditional-calendar-of-the-port-of-bilbao\/\" rel=\"next\">The unmistakable style of the photographer Manuel Torcida to grace the now traditional calendar of the Port of Bilbao<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao The works will mean that the OPS system to be deployed to power vessels at berth will use green energy The aim of the BilbOPS project is to reduce pollutant emission and [&hellip;]<\/p>\n","protected":false},"author":4068,"featured_media":51420,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-51425","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao The works will mean that the OPS system to be deployed to power vessels at berth will use green energy The aim of the BilbOPS project is to reduce pollutant emission and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-03T14:15:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-03T14:19:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"799\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83\"},\"headline\":\"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth\",\"datePublished\":\"2024-12-03T14:15:52+00:00\",\"dateModified\":\"2024-12-03T14:19:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/\"},\"wordCount\":354,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/\",\"name\":\"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg\",\"datePublished\":\"2024-12-03T14:15:52+00:00\",\"dateModified\":\"2024-12-03T14:19:01+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg\",\"width\":1200,\"height\":799,\"caption\":\"Instalaci\u00f3n fotovolt\u00e1ica\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"description\":\"Usuario de Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/izaskun-gomez-sanchez\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/","og_locale":"en_US","og_type":"article","og_title":"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth - Port of Bilbao","og_description":"Port of Bilbao The works will mean that the OPS system to be deployed to power vessels at berth will use green energy The aim of the BilbOPS project is to reduce pollutant emission and [&hellip;]","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2024-12-03T14:15:52+00:00","article_modified_time":"2024-12-03T14:19:01+00:00","og_image":[{"width":1200,"height":799,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83"},"headline":"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth","datePublished":"2024-12-03T14:15:52+00:00","dateModified":"2024-12-03T14:19:01+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/"},"wordCount":354,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/","name":"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg","datePublished":"2024-12-03T14:15:52+00:00","dateModified":"2024-12-03T14:19:01+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/12\/9424.jpg","width":1200,"height":799,"caption":"Instalaci\u00f3n fotovolt\u00e1ica"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/green-light-for-setting-up-a-photovoltaic-solar-plant-in-the-port-of-bilbao-to-supply-power-to-vessels-at-berth\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"Green light for setting up a photovoltaic solar plant in the Port of Bilbao to supply power to vessels at berth"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/1d11de2f1ee0b3dd8f67eda598a40f83","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3d947c7608b196c0089ee294120b70ed086584ce05c7a509d1483f936faff5d9?s=96&d=mm&r=g","caption":"Bilbaoport"},"description":"Usuario de Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/author\/izaskun-gomez-sanchez\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/51425","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/4068"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=51425"}],"version-history":[{"count":2,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/51425\/revisions"}],"predecessor-version":[{"id":51451,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/51425\/revisions\/51451"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/51420"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=51425"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=51425"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=51425"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}