	{"id":49583,"date":"2024-05-15T07:36:15","date_gmt":"2024-05-15T05:36:15","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=49583"},"modified":"2024-05-15T07:36:55","modified_gmt":"2024-05-15T05:36:55","slug":"the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/","title":{"rendered":"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<h6>The Port Authority of Bilbao thus concludes the enlargement of the Outer Abra to encourage ro-ro and project cargo traffic<\/h6>\n<p>At its meeting today, the Council of Ministers, on the proposal of the Ministry of Transport and Sustainable Mobility, authorised the conclusion of the works contract for the Central Pier of the extension of the port of Bilbao in the Outer Abra (2nd phase), for 55,444,180.23 euros.<\/p>\n<p>Once this project has been completed, the Port Authority of Bilbao will have concluded the enlargement of the port in the Outer Abra, works on which began in the 1990s. The end goal is to cater for and encourage ro-ro and wind power traffic, components for which are manufactured in the port&#8217;s hinterland.<\/p>\n<p>Specifically, the works provide for the construction of two new docks: Dock A3, 664 metres long, and Dock A4, extended to 347 metres. Both docks have a draft of 21 metres, and the works will generate a new surface area of some 31.2 hectares.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_49579\" aria-describedby=\"caption-attachment-49579\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-49579 size-full\" title=\"View of the Central Pier\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg\" alt=\"View of the Central Pier\" width=\"1200\" height=\"797\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385-535x355.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385-150x100.jpg 150w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-49579\" class=\"wp-caption-text\">View of the Central Pier<\/figcaption><\/figure>\n<p>This project, which has obtained a favourable environmental impact statement, forms part of the current 2023-27 investment plan of the Port Authority of Bilbao, which is included in the Business Plan drawn up in agreement with <em>Puertos del Estado<\/em>.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-port-of-bilbao-brings-sea-travel-to-expovacaciones\/\" rel=\"prev\">The Port of Bilbao brings sea travel to Expovacaciones<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/two-shipping-lines-operating-in-the-port-of-bilbao-eligible-for-the-third-call-for-eco-incentives\/\" rel=\"next\">Two shipping lines operating in the Port of Bilbao, eligible for the third call for eco-incentives<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorThe Port of Bilbao brings sea travel to ExpovacacionesSiguienteTwo shipping lines operating in the Port of Bilbao, eligible for the third call for eco-incentives<\/p>\n","protected":false},"author":7,"featured_media":49579,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-49583","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorThe Port of Bilbao brings sea travel to ExpovacacionesSiguienteTwo shipping lines operating in the Port of Bilbao, eligible for the third call for eco-incentives\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-15T05:36:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-15T05:36:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"797\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros\",\"datePublished\":\"2024-05-15T05:36:15+00:00\",\"dateModified\":\"2024-05-15T05:36:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/\"},\"wordCount\":244,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/\",\"name\":\"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg\",\"datePublished\":\"2024-05-15T05:36:15+00:00\",\"dateModified\":\"2024-05-15T05:36:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg\",\"width\":1200,\"height\":797,\"caption\":\"Espig\u00f3n Central del puerto\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/","og_locale":"en_US","og_type":"article","og_title":"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros - Port of Bilbao","og_description":"Port of Bilbao AnteriorThe Port of Bilbao brings sea travel to ExpovacacionesSiguienteTwo shipping lines operating in the Port of Bilbao, eligible for the third call for eco-incentives","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2024-05-15T05:36:15+00:00","article_modified_time":"2024-05-15T05:36:55+00:00","og_image":[{"width":1200,"height":797,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros","datePublished":"2024-05-15T05:36:15+00:00","dateModified":"2024-05-15T05:36:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/"},"wordCount":244,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/","name":"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg","datePublished":"2024-05-15T05:36:15+00:00","dateModified":"2024-05-15T05:36:55+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/05\/Puerto-de-Bilbao-9385.jpg","width":1200,"height":797,"caption":"Espig\u00f3n Central del puerto"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/the-government-authorises-the-tender-for-the-construction-of-the-central-pier-of-the-extension-of-the-port-of-bilbao-for-55-million-euros\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"The Government authorises the tender for the construction of the Central Pier of the extension of the Port of Bilbao for 55 million euros"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/49583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=49583"}],"version-history":[{"count":1,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/49583\/revisions"}],"predecessor-version":[{"id":49584,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/49583\/revisions\/49584"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/49579"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=49583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=49583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=49583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}