	{"id":48916,"date":"2024-02-02T12:01:32","date_gmt":"2024-02-02T11:01:32","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=48916"},"modified":"2024-02-16T13:05:11","modified_gmt":"2024-02-16T12:05:11","slug":"works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/","title":{"rendered":"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks."},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p>Total investment made by the Port Authority during 2023 amounted to EUR 18.7 million. Foremost among this investment have been the works to expand Dock AZ1 (EUR 4.3 million), the filling at the central breakwater (EUR 3.15 million), the reinforcement of the bridge structure on the N644 at the Iberdrola intake site (EUR 2.2 million), port-town relations (EUR 1.9 million) and the vacuum sewerage system in the Outer Abra (EUR 1.78 million, of the EUR 20 million investment scheduled up to 2025).<\/p>\n<p>The investment forecast for 2024 is EUR 77.8 million, a high figure due, amongst other things, to the start of the second phase of the works on the central breakwater which will provide 30 new hectares of space in a port with a high degree of occupation and great demand for land. The full development and use of the Outer Abra will thus enter its final phase. The works are expected to be put out to tender at Easter, once the project has been approved by the Council of Ministers, for an amount of EUR 54.4 million and a completion period of 26 months. The contract could be awarded in the summer and works could potentially begin in the last quarter of the year.<\/p>\n<p>At the same time, within the framework of the Port of Bilbao Energy Transition Plan and with a view to delivering defined emission reduction targets, works on the electrification of the docks are being done so that ships can be connected to the onshore power grid and switch off their auxiliary engines, thereby reducing CO2 emissions and noise and vibration levels. The first phase of the BilbOPS project, focusing on the A-5 Dock of the central breakwater, was awarded in December for EUR 4.7 million, and<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_48629\" aria-describedby=\"caption-attachment-48629\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-48629 size-large\" title=\"General view of the port\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-1200x848.jpg\" alt=\"General view of the port\" width=\"1200\" height=\"848\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-1200x848.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-535x378.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-150x106.jpg 150w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-1536x1086.jpg 1536w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-2048x1448.jpg 2048w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-48629\" class=\"wp-caption-text\">General view of the port<\/figcaption><\/figure>\n<p>is supported by a EUR 4.3 million grant from the Recovery and Resilience Facility.<\/p>\n<p>The BilbOPS initiative, which is expected to be operational in 2026, requires an investment of EUR 78 million, of which EUR 14.2 million will be subsidised by the European Commission under the CEF Transport 2021-2027 grant programme. The project also entails that 20% of the power generated be from renewable sources, with the intention of increasing this figure to 50% by 2028.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks. - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-port-of-bilbao-closes-the-year-with-a-positive-result-as-it-prepares-for-its-last-major-expansion-and-work-begins-on-the-electrification-of-the-docks\/\" rel=\"prev\">The Port of Bilbao closes the year with a positive result, as it prepares for its last major expansion and work begins on the electrification of the docks.<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/port-charges-remain-unchanged-for-the-fourth-year-running\/\" rel=\"next\">Port charges remain unchanged for the fourth year running<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorThe Port of Bilbao closes the year with a positive result, as it prepares for its last major expansion and work begins on the electrification of the docks.SiguientePort charges remain unchanged for [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":48629,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-48916","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks. - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks. - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorThe Port of Bilbao closes the year with a positive result, as it prepares for its last major expansion and work begins on the electrification of the docks.SiguientePort charges remain unchanged for [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-02T11:01:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-02-16T12:05:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1810\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks.\",\"datePublished\":\"2024-02-02T11:01:32+00:00\",\"dateModified\":\"2024-02-16T12:05:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/\"},\"wordCount\":386,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/\",\"name\":\"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks. - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg\",\"datePublished\":\"2024-02-02T11:01:32+00:00\",\"dateModified\":\"2024-02-16T12:05:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg\",\"width\":2560,\"height\":1810,\"caption\":\"Vista general del puerto\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks. - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/","og_locale":"en_US","og_type":"article","og_title":"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks. - Port of Bilbao","og_description":"Port of Bilbao AnteriorThe Port of Bilbao closes the year with a positive result, as it prepares for its last major expansion and work begins on the electrification of the docks.SiguientePort charges remain unchanged for [&hellip;]","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2024-02-02T11:01:32+00:00","article_modified_time":"2024-02-16T12:05:11+00:00","og_image":[{"width":2560,"height":1810,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks.","datePublished":"2024-02-02T11:01:32+00:00","dateModified":"2024-02-16T12:05:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/"},"wordCount":386,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/","name":"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks. - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg","datePublished":"2024-02-02T11:01:32+00:00","dateModified":"2024-02-16T12:05:11+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2024\/02\/Vista-general-scaled.jpg","width":2560,"height":1810,"caption":"Vista general del puerto"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/works-to-begin-in-2024-on-the-final-stage-of-the-port-expansion-and-the-electrification-of-the-docks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"Works to begin in 2024 on the final stage of the port expansion and the electrification of the docks."}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/48916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=48916"}],"version-history":[{"count":2,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/48916\/revisions"}],"predecessor-version":[{"id":48918,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/48916\/revisions\/48918"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/48629"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=48916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=48916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=48916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}