	{"id":48495,"date":"2023-12-13T11:01:04","date_gmt":"2023-12-13T10:01:04","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=48495"},"modified":"2023-12-14T10:52:04","modified_gmt":"2023-12-14T09:52:04","slug":"first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/","title":{"rendered":"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-48500 size-medium\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/logo-conjunto-Financiado-UE-y-Mecanismo-recuperacion-535x63.png\" alt=\"\" width=\"535\" height=\"63\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/logo-conjunto-Financiado-UE-y-Mecanismo-recuperacion-535x63.png 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/logo-conjunto-Financiado-UE-y-Mecanismo-recuperacion-150x18.png 150w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/logo-conjunto-Financiado-UE-y-Mecanismo-recuperacion.png 1200w\" sizes=\"auto, (max-width: 535px) 100vw, 535px\" \/><\/p>\n<h6>Electrification of Dock A-5 of the Central Breakwater will require an investment of EUR 4.7 million.<\/h6>\n<p>The Port Authority of Bilbao has awarded Tecuni S.A.U. the first phase for construction project planning and execution of the works for a new electricity infrastructure at Dock A-5 of the Central Breakwater of the Port of Bilbao, to connect vessels to the onshore power grid. The contract, which also includes a comprehensive maintenance service, is worth EUR 4.7 million.<\/p>\n<p>After signing the contract, the contractor will have a period of two months to draw up the detailed project, which will be sent to <em>Puertos del Estado<\/em> \/ The State Ports Authority for the corresponding binding report. Once any required modifications have been made and the detailed design approved, the works will have an 18 months completion date. Similarly, once the works have been completed and handed over, a period of three years, which may be extended annually for a further two years, will be established for the comprehensive maintenance service.<\/p>\n<p>Dock A-5 will be equipped with four connection points through two 2.5 MVA Onshore Power Supply (OPS) sets, enabling vessels at berth to connect to the port facilities&#8217; power grid and to switch off their auxiliary generators, thereby reducing the use of fossil fuels by vessels during their stay in port and reducing greenhouse gas emissions and the noise and vibration levels they produce.<\/p>\n<p>The project to equip Dock A-5 with OPS technology, which has secured a EUR 4.3 million grant from the Recovery and Resilience Facility, is part of<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_48489\" aria-describedby=\"caption-attachment-48489\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-48489 size-full\" title=\"Dock A5\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg\" alt=\"Dock A5\" width=\"1200\" height=\"800\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5-535x357.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5-150x100.jpg 150w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-48489\" class=\"wp-caption-text\">Dock A5<\/figcaption><\/figure>\n<p>the Port Authority&#8217;s BilbOPS initiative to deploy a total of 11 connection points at docks with recurrent traffic, both freight and passenger. In addition, and to ensure that part of the energy consumed by the connected vessels is of renewable and sustainable origin, other related projects will be tendered and contracted at a later stage, including various PV power plants.<\/p>\n<p>The BilbOPS initiative, scheduled to be operational by 2026, will require an investment of EUR 51.8 million, of which 30%, i.e. EUR 14.2 million, will be subsidised by the European Commission within the CEF Transport 2021-2027 Programme.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-provincial-council-of-bizkaia-and-the-port-authority-of-bilbao-working-together-on-an-innovation-project-to-improve-traffic-management-and-the-transport-of-goods\/\" rel=\"prev\">The Provincial Council of Bizkaia and the Port Authority of Bilbao, working together on an innovation project to improve traffic management and the transport of goods.<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/olabarri-palace-to-be-converted-into-a-hotel\/\" rel=\"next\">Olabarri Palace to be converted into a hotel<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorThe Provincial Council of Bizkaia and the Port Authority of Bilbao, working together on an innovation project to improve traffic management and the transport of goods.SiguienteOlabarri Palace to be converted into a [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":48489,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-48495","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorThe Provincial Council of Bizkaia and the Port Authority of Bilbao, working together on an innovation project to improve traffic management and the transport of goods.SiguienteOlabarri Palace to be converted into a [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-13T10:01:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-14T09:52:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao\",\"datePublished\":\"2023-12-13T10:01:04+00:00\",\"dateModified\":\"2023-12-14T09:52:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/\"},\"wordCount\":382,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/\",\"name\":\"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg\",\"datePublished\":\"2023-12-13T10:01:04+00:00\",\"dateModified\":\"2023-12-14T09:52:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Muelle A5\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/","og_locale":"en_US","og_type":"article","og_title":"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao - Port of Bilbao","og_description":"Port of Bilbao AnteriorThe Provincial Council of Bizkaia and the Port Authority of Bilbao, working together on an innovation project to improve traffic management and the transport of goods.SiguienteOlabarri Palace to be converted into a [&hellip;]","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2023-12-13T10:01:04+00:00","article_modified_time":"2023-12-14T09:52:04+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao","datePublished":"2023-12-13T10:01:04+00:00","dateModified":"2023-12-14T09:52:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/"},"wordCount":382,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/","name":"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg","datePublished":"2023-12-13T10:01:04+00:00","dateModified":"2023-12-14T09:52:04+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/12\/Muelle-A5.jpg","width":1200,"height":800,"caption":"Muelle A5"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/first-works-awarded-to-deploy-an-onshore-power-supply-for-vessels-in-the-port-of-bilbao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"First works awarded to deploy an onshore power supply for vessels in the Port of Bilbao"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/48495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=48495"}],"version-history":[{"count":0,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/48495\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/48489"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=48495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=48495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=48495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}