	{"id":47791,"date":"2023-07-03T09:41:50","date_gmt":"2023-07-03T07:41:50","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=47791"},"modified":"2023-07-04T08:49:21","modified_gmt":"2023-07-04T06:49:21","slug":"an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/","title":{"rendered":"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p>The Port Authority of Bilbao has completed the extension works of the port\u2019s AZ-1 Dock, which will now officially be known as AZ-0 Dock. The works have generated approximately 50,000 m\u00b2 of new surface area and a new berthing line of 251 linear metres in the Zierbena dock.<\/p>\n<p>The new infrastructure, on which construction work began in September 2021 and which has required an investment of EUR 27.4 million, will be used primarily for commercial traffic, specifically bulk solids, and will help reduce congestion in the surrounding docks and to reorganise the different types of traffic for greater efficiency. In this respect, and in view of the fact that several companies have already expressed their interest in setting up operations in the expansion area, the Port Authority will launch a tender this summer for development and paving works.<\/p>\n<h6>Innovative and sustainable construction<\/h6>\n<p>To complete this new surface area, five 50-metre long, 17-metre wide and 24-metre high (equivalent to a 7-storey building) reinforced concrete caissons have had to be set up on a specific structure commonly known as a floating caisson or dock. These caissons have a series of holes on the inside to enable them to float and to be transported by tugboat to their final location and anchored to a rock mattress foundation previously prepared on the seabed. The caissons were temporarily filled with water and later with sand before being permanently anchored. The backfill area was subsequently filled with 750,000 m\u00b3 of sand extracted from the seabed using a suction dredger, whilst the outer wall of the dock is protected from erosion by a breakwater and a pile of concrete blocks.<\/p>\n<p>Particular mention should also be made of the fact that 4,000 blocks of 10-tonne high-density steel concrete have been used in the execution of<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_47785\" aria-describedby=\"caption-attachment-47785\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-47785 size-full\" title=\"Dock AZ0\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg\" alt=\"Dock AZ0\" width=\"1200\" height=\"800\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193-535x357.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193-150x100.jpg 150w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-47785\" class=\"wp-caption-text\">Dock AZ0<\/figcaption><\/figure>\n<p>this project. As a result, waste from electric furnace steelworks, known as\u00a0black slag, has been recovered and reused as coarse aggregates in the concrete, instead of dumping the slag in landfills and having to mine the equivalent amount of material (around 20,000 tonnes) in quarries, thus favouring the circular economy. These measures are in line with the strategic objectives of the European Union and the Waste Prevention and Management Plan of the Autonomous Community of the Basque Country\/2020. Furthermore, reducing the size of the protection blocks from the 15 tonnes initially planned to 10 tonnes by using this high-density steel concrete has led to a decrease in concrete consumption of around 3,000 m\u00b3, with the consequent saving in the consumption of natural resources and raw materials and a reduction in the carbon footprint of approximately 17% compared to what was initially envisaged.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/two-routes-between-bilbao-and-the-united-kingdom-identified-as-green-shipping-corridors-for-the-decarbonisation-of-shipping\/\" rel=\"prev\">Two routes between Bilbao and the United Kingdom identified as green shipping corridors for the decarbonisation of shipping<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/the-port-of-bilbao-venue-for-the-installation-on-a-commercial-vessel-of-the-largest-suction-sails-in-the-world\/\" rel=\"next\">The Port of Bilbao, venue for the installation on a commercial vessel of the largest suction sails in the world<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorTwo routes between Bilbao and the United Kingdom identified as green shipping corridors for the decarbonisation of shippingSiguienteThe Port of Bilbao, venue for the installation on a commercial vessel of the largest [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":47785,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-47791","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorTwo routes between Bilbao and the United Kingdom identified as green shipping corridors for the decarbonisation of shippingSiguienteThe Port of Bilbao, venue for the installation on a commercial vessel of the largest [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-03T07:41:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-04T06:49:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock\",\"datePublished\":\"2023-07-03T07:41:50+00:00\",\"dateModified\":\"2023-07-04T06:49:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/\"},\"wordCount\":468,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/\",\"name\":\"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg\",\"datePublished\":\"2023-07-03T07:41:50+00:00\",\"dateModified\":\"2023-07-04T06:49:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Muelle AZ0\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/","og_locale":"en_US","og_type":"article","og_title":"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock - Port of Bilbao","og_description":"Port of Bilbao AnteriorTwo routes between Bilbao and the United Kingdom identified as green shipping corridors for the decarbonisation of shippingSiguienteThe Port of Bilbao, venue for the installation on a commercial vessel of the largest [&hellip;]","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2023-07-03T07:41:50+00:00","article_modified_time":"2023-07-04T06:49:21+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock","datePublished":"2023-07-03T07:41:50+00:00","dateModified":"2023-07-04T06:49:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/"},"wordCount":468,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/","name":"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg","datePublished":"2023-07-03T07:41:50+00:00","dateModified":"2023-07-04T06:49:21+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2023\/07\/9193.jpg","width":1200,"height":800,"caption":"Muelle AZ0"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/an-extra-50000-m%c2%b2-of-land-created-in-the-port-of-bilbao-through-the-extension-works-of-the-az-1-dock\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"An extra 50,000 m\u00b2 of land created in the Port of Bilbao through the extension works of the AZ-1 Dock"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/47791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=47791"}],"version-history":[{"count":0,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/47791\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/47785"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=47791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=47791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=47791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}