	{"id":41274,"date":"2021-06-02T12:04:03","date_gmt":"2021-06-02T10:04:03","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=41274"},"modified":"2021-06-07T09:10:36","modified_gmt":"2021-06-07T07:10:36","slug":"completion-of-filling-works-on-the-left-bank-of-the-deusto-canal","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/","title":{"rendered":"Completion of filling works on the left bank of the Deusto Canal"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div>\n<div class=\"one_half bbcol\">\n<p>After 22 months of work, this week saw the completion of the filling works on the left bank of the Deusto Canal, which have created an area of some 50,000 m\u00b2 in the public port domain and which will be used for the urban development of the Island of Zorrotzaurre.<\/p>\n<p>These works, awarded by the Port Authority of Bilbao and the result of an innovative inter-institutional agreement, have required the construction of more than 750 reinforced concrete panels to make up the 1.5 km of wall needed to contain the backfill in two separate areas of the Deusto Canal. Prior to this, wall construction had required the creation of a rock mattress foundation and reinforcement of the bottom of the estuary, which in this area was very thick with sludge, by driving in huge quantities of gravel in the form of columns until it reached the rock. In total, around 60 km of gravel columns have been built.<\/p>\n<p>The most complex work has been the positioning of these walls on the North Point of the Island of Zorrotzaurre, on account of their distance from the land. This required the use of a crane with a high reach capacity. The most distant modules (those that make up the peak) were positioned some 115 m from the land.<\/p>\n<h6><strong>Institutional agreement on the works required to develop Zorrotzaurre<\/strong><\/h6>\n<p>The filling works on the left bank of the Deusto Canal, awarded by the Port Authority to the joint venture formed by <em>Acciona Construcci\u00f3n<\/em> and <em>Altuna y Ur\u00eda<\/em> for approximately EUR 20 million, have been essential for the Zorrotzaurre development project.<\/p>\n<p>This ground-breaking work and unique tender has been made possible by a complex agreement signed in January 2018 between the Ministry of Public Works, the State Ports Authority, the Port Authority of Bilbao, Bilbao City Council and the Department of the Environment, Territorial Planning and Housing of the Basque Government.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_41277\" aria-describedby=\"caption-attachment-41277\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-41277 size-full\" title=\"Deusto Canal\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg\" alt=\"Deusto Canal\" width=\"1200\" height=\"900\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto-535x401.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto-150x113.jpg 150w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-41277\" class=\"wp-caption-text\">Deusto Canal<\/figcaption><\/figure>\n<p>In line with the contractual procedure, the successful tenderer has been responsible for the execution of the backfilling works. For its part, the Port Authority authorised the execution of the filling works in the port public domain and will subsequently declare the land generated to be surplus. Finally, the plot of land will be formally sold and transferred by the Port Authority to the successful bidder-acquirer, who then be able to proceed with the urban development and promotion of the building product foreseen in the Integrated Development (AI-2) of the Special Urban Development Plan for the Zorrotzaurre Mixed Area, which foresees 6 residential plots, with 12 blocks of flats, assuming a percentage of ownership in the AI-2 close to 80%.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: Completion of filling works on the left bank of the Deusto Canal - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/w-e-c-lines-expands-its-service-capacity-on-the-line-which-started-in-january-between-the-port-of-bilbao-and-the-north-of-europe-and-the-united-kingdom\/\" rel=\"prev\">W.E.C Lines expands its service capacity on the line which started in January between the Port of Bilbao and the north of Europe and the United Kingdom<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/construction-moving-forward-on-first-floating-wind-platform-set-to-be-installed-at-bimepz\/\" rel=\"next\">Construction moving forward on first floating wind platform set to be installed at BiMEPz<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorW.E.C Lines expands its service capacity on the line which started in January between the Port of Bilbao and the north of Europe and the United KingdomSiguienteConstruction moving forward on first floating [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":41277,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-41274","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Completion of filling works on the left bank of the Deusto Canal - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Completion of filling works on the left bank of the Deusto Canal - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorW.E.C Lines expands its service capacity on the line which started in January between the Port of Bilbao and the north of Europe and the United KingdomSiguienteConstruction moving forward on first floating [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2021-06-02T10:04:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-07T07:10:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"Completion of filling works on the left bank of the Deusto Canal\",\"datePublished\":\"2021-06-02T10:04:03+00:00\",\"dateModified\":\"2021-06-07T07:10:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/\"},\"wordCount\":458,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/\",\"name\":\"Completion of filling works on the left bank of the Deusto Canal - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg\",\"datePublished\":\"2021-06-02T10:04:03+00:00\",\"dateModified\":\"2021-06-07T07:10:36+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg\",\"width\":1200,\"height\":900,\"caption\":\"Deusto Canal\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Completion of filling works on the left bank of the Deusto Canal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Completion of filling works on the left bank of the Deusto Canal - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/","og_locale":"en_US","og_type":"article","og_title":"Completion of filling works on the left bank of the Deusto Canal - Port of Bilbao","og_description":"Port of Bilbao AnteriorW.E.C Lines expands its service capacity on the line which started in January between the Port of Bilbao and the north of Europe and the United KingdomSiguienteConstruction moving forward on first floating [&hellip;]","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2021-06-02T10:04:03+00:00","article_modified_time":"2021-06-07T07:10:36+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"Completion of filling works on the left bank of the Deusto Canal","datePublished":"2021-06-02T10:04:03+00:00","dateModified":"2021-06-07T07:10:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/"},"wordCount":458,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/","name":"Completion of filling works on the left bank of the Deusto Canal - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg","datePublished":"2021-06-02T10:04:03+00:00","dateModified":"2021-06-07T07:10:36+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2021\/06\/Canal-de-Deusto.jpg","width":1200,"height":900,"caption":"Deusto Canal"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/completion-of-filling-works-on-the-left-bank-of-the-deusto-canal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"Completion of filling works on the left bank of the Deusto Canal"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/41274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=41274"}],"version-history":[{"count":0,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/41274\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/41277"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=41274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=41274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=41274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}