	{"id":30929,"date":"2018-10-05T12:40:15","date_gmt":"2018-10-05T10:40:15","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=30929"},"modified":"2018-10-08T08:18:58","modified_gmt":"2018-10-08T06:18:58","slug":"port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/","title":{"rendered":"Port Authority of Bilbao commences works to complete the first stage of the Central Pier"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p>The works on the first stage of the Central Pier, destined to receive new business projects, have commenced their second phase with the extraction of sand which will be used for the completion of the works. The hydraulic filling used here is similar to those previously carried out in the Port itself and which <em>have not directly affected either the ecosystem or the other beaches in the area.<\/em> The method has been endorsed by reports from independent organisms and entities, and holds the perceptive environmental impact study, a favourable declaration of its impact on the environment and an environmental monitoring plan.<\/p>\n<p>The Port of Bilbao has an almost 90% occupancy level, which advises creating surfaces in order to cater for new logistics, commercial or even industrial projects. Thus, the Central Pier Extension Project is a strategic work for the Port of Bilbao, which when completed will enable it to maintain its position as the reference port in the Bay of Biscay, while at the same time generating wealth and employment for the Basque Country.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_30930\" aria-describedby=\"caption-attachment-30930\" style=\"width: 535px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-30930 size-medium\" title=\"Works of the Central Pier\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2-535x355.jpg\" alt=\"Works of the Central Pier\" width=\"535\" height=\"355\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2-535x355.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2-150x100.jpg 150w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg 1200w\" sizes=\"auto, (max-width: 535px) 100vw, 535px\" \/><\/a><figcaption id=\"caption-attachment-30930\" class=\"wp-caption-text\">Works of the Central Pier<\/figcaption><\/figure>\n<p>The works were commenced in September 2016 with a 39-month completion period. The first stage has lasted 24 months, three less than scheduled, and the second will be concluded in February 2019.<\/p>\n<p><a href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/dosier-de-prensa-en-castellano-5-octubre.pdf\" target=\"_blank\" rel=\"noopener\">More information<\/a><\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: Port Authority of Bilbao commences works to complete the first stage of the Central Pier - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/port-of-bilbao-receives-professionals-from-the-port-training-institute-of-morocco-in-collaboration-with-berge\/\" rel=\"prev\">Port of Bilbao receives professionals from the Port Training Institute of Morocco in collaboration with Berg\u00e9.<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/port-of-bilbao-and-mercabilbao-to-attend-fruit-attraction-fair-to-advance-internationalisation-strategy\/\" rel=\"next\">Port of Bilbao and Mercabilbao to attend fruit attraction fair to advance internationalisation strategy<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorPort of Bilbao receives professionals from the Port Training Institute of Morocco in collaboration with Berg\u00e9.SiguientePort of Bilbao and Mercabilbao to attend fruit attraction fair to advance internationalisation strategy<\/p>\n","protected":false},"author":7,"featured_media":30930,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-30929","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Port Authority of Bilbao commences works to complete the first stage of the Central Pier - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Port Authority of Bilbao commences works to complete the first stage of the Central Pier - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorPort of Bilbao receives professionals from the Port Training Institute of Morocco in collaboration with Berg\u00e9.SiguientePort of Bilbao and Mercabilbao to attend fruit attraction fair to advance internationalisation strategy\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-05T10:40:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-10-08T06:18:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"797\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"Port Authority of Bilbao commences works to complete the first stage of the Central Pier\",\"datePublished\":\"2018-10-05T10:40:15+00:00\",\"dateModified\":\"2018-10-08T06:18:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/\"},\"wordCount\":241,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/\",\"name\":\"Port Authority of Bilbao commences works to complete the first stage of the Central Pier - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg\",\"datePublished\":\"2018-10-05T10:40:15+00:00\",\"dateModified\":\"2018-10-08T06:18:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg\",\"width\":1200,\"height\":797,\"caption\":\"Works of the Central Pier\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Port Authority of Bilbao commences works to complete the first stage of the Central Pier\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Port Authority of Bilbao commences works to complete the first stage of the Central Pier - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/","og_locale":"en_US","og_type":"article","og_title":"Port Authority of Bilbao commences works to complete the first stage of the Central Pier - Port of Bilbao","og_description":"Port of Bilbao AnteriorPort of Bilbao receives professionals from the Port Training Institute of Morocco in collaboration with Berg\u00e9.SiguientePort of Bilbao and Mercabilbao to attend fruit attraction fair to advance internationalisation strategy","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2018-10-05T10:40:15+00:00","article_modified_time":"2018-10-08T06:18:58+00:00","og_image":[{"width":1200,"height":797,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"Port Authority of Bilbao commences works to complete the first stage of the Central Pier","datePublished":"2018-10-05T10:40:15+00:00","dateModified":"2018-10-08T06:18:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/"},"wordCount":241,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/","name":"Port Authority of Bilbao commences works to complete the first stage of the Central Pier - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg","datePublished":"2018-10-05T10:40:15+00:00","dateModified":"2018-10-08T06:18:58+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/10\/ecentral-2.jpg","width":1200,"height":797,"caption":"Works of the Central Pier"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/port-authority-of-bilbao-commences-works-to-complete-the-first-stage-of-the-central-pier\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"Port Authority of Bilbao commences works to complete the first stage of the Central Pier"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/30929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=30929"}],"version-history":[{"count":0,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/30929\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/30930"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=30929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=30929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=30929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}