	{"id":25131,"date":"2018-02-16T13:20:08","date_gmt":"2018-02-16T12:20:08","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=25131"},"modified":"2018-02-19T08:45:23","modified_gmt":"2018-02-19T07:45:23","slug":"pba-investment-amounts-61-5-million-euros-central-pier-main-building-project","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/","title":{"rendered":"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p>In 2017, the Port Authority of Bilbao invested 61.5 million euros. The amount planned for 2018 is 49.2 million.<\/p>\n<p>In 2017, the following two projects were completed:<\/p>\n<p><strong>Arasur rail sidings<\/strong><\/p>\n<p>This investment \u2013 which has been made in conjunction with the Autonomous Basque Government and the Territorial Council of Alava \u2013 amounts to 5.8 million euros. The TELOF works commenced in June 2016 and concluded at the end of 2017. At present a headshunt with a one million-euro estimate is being built and fitting out is pending tender.<\/p>\n<p><strong>Maritime cruise station and portable gangway<\/strong><\/p>\n<p>The works on the new Port of Bilbao cruise passenger terminal, situated on Cruise Berth Getxo 3, commenced in spring 2016 and the building was inaugurated on 29 March this year. Total investment was 6 million euros, 4.6 corresponding to the building itself, 1 million to the gangway and 0.4 million to fitting out the surroundings.<\/p>\n<p>Works in progress are as follows:<\/p>\n<p><strong>First Phase of Central Pier\u2013 Future Proofing Bilbao and stabilisation works on the old Punta Lucero quarry<\/strong><\/p>\n<p><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/cef_conecting_europe_facility_logo_en.png\" rel=\"attachment wp-att-18364\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-18364 size-full\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/cef_conecting_europe_facility_logo_en.png\" alt=\"\" width=\"370\" height=\"52\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/cef_conecting_europe_facility_logo_en.png 370w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/cef_conecting_europe_facility_logo_en-150x21.png 150w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/cef_conecting_europe_facility_logo_en-250x35.png 250w\" sizes=\"auto, (max-width: 370px) 100vw, 370px\" \/><\/a><\/p>\n<p>The works were adjudicated in June 2016 and will be completed in 2019, at an estimated cost of 74 million euros after the last modification. The European Commission will contribute 20% of this amount under the Connecting Europe Facility (CEF) Programme.<\/p>\n<p>In the first phase, 334,000 m\u00b2 of land will be reclaimed from the sea and 1,081metres berthing will be created together with 21-metre depths. The surfaces obtained will amount to more than half of the 600,000 m\u00b2 of the completed Central Pier. The project also includes the stabilisation works on the old Punta Lucero quarry.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_25133\" aria-describedby=\"caption-attachment-25133\" style=\"width: 535px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg\" rel=\"attachment wp-att-25133\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25133 size-medium\" title=\"Construction of the Central Pier\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2-535x355.jpg\" alt=\"Construction of the Central Pier\" width=\"535\" height=\"355\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2-535x355.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2-150x100.jpg 150w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg 1200w\" sizes=\"auto, (max-width: 535px) 100vw, 535px\" \/><\/a><figcaption id=\"caption-attachment-25133\" class=\"wp-caption-text\">Construction of the Central Pier<\/figcaption><\/figure>\n<p><strong>Pavilions for logistics-industrial activities<\/strong><\/p>\n<p>In May, the building of a pavilion for logistics-industrial activities was awarded for 17.59 million euros and will be licensed to Haizea Wind for the creation of a plant for the manufacturing and exporting of marine wind towers and other components. The works are expected to be completed in the first quarter of the year.<\/p>\n<p><strong>New Ro-Ro ramp<\/strong><\/p>\n<p>In the last quarter Astilleros Zamakona began constructing what will be Ro-Ro ramp, N\u00ba 8 in the Port. The cost of the award is 2.74 million euros. The completion period is six months.<\/p>\n<p><strong>Filling in Udondo Basin<\/strong><\/p>\n<p>The project to fill in Udondo Basin at Erandio will create a new 22,700m\u00b2 esplanade with a view to gaining new spaces for industrial activities with dock accesses. The verification for readiness document was signed this week for 2.7 million euros, meaning the works can now commence.<\/p>\n<p><strong>Installation of more efficient lighting<\/strong><\/p>\n<p>The Port Authority is investing 1.9 million euros on the supply and installation of efficient lighting using LED technology in the Port\u2019s outer zone network. At present, preliminary work is being carried out and shortly, replacement of equipment will commence. It is expected that the project completion in 2018 will bring about approximately 25% saving on lighting.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/private-enterprise-invests-nearly-70-million-euros\/\" rel=\"prev\">Private Enterprise invests nearly 70 million euros<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/port-bilbao-traffic-grows-7-shows-greatest-increase-last-eleven-years\/\" rel=\"next\">Port of Bilbao traffic grows 7% and shows greatest increase in last eleven years<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorPrivate Enterprise invests nearly 70 million eurosSiguientePort of Bilbao traffic grows 7% and shows greatest increase in last eleven years<\/p>\n","protected":false},"author":7,"featured_media":25133,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-25131","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorPrivate Enterprise invests nearly 70 million eurosSiguientePort of Bilbao traffic grows 7% and shows greatest increase in last eleven years\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2018-02-16T12:20:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-02-19T07:45:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"797\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project\",\"datePublished\":\"2018-02-16T12:20:08+00:00\",\"dateModified\":\"2018-02-19T07:45:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/\"},\"wordCount\":491,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/\",\"name\":\"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg\",\"datePublished\":\"2018-02-16T12:20:08+00:00\",\"dateModified\":\"2018-02-19T07:45:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg\",\"width\":1200,\"height\":797,\"caption\":\"Construction of the Central Pier\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/","og_locale":"en_US","og_type":"article","og_title":"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project - Port of Bilbao","og_description":"Port of Bilbao AnteriorPrivate Enterprise invests nearly 70 million eurosSiguientePort of Bilbao traffic grows 7% and shows greatest increase in last eleven years","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2018-02-16T12:20:08+00:00","article_modified_time":"2018-02-19T07:45:23+00:00","og_image":[{"width":1200,"height":797,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project","datePublished":"2018-02-16T12:20:08+00:00","dateModified":"2018-02-19T07:45:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/"},"wordCount":491,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/","name":"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg","datePublished":"2018-02-16T12:20:08+00:00","dateModified":"2018-02-19T07:45:23+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2018\/02\/8470-2.jpg","width":1200,"height":797,"caption":"Construction of the Central Pier"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/pba-investment-amounts-61-5-million-euros-central-pier-main-building-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"PBA investment amounts to 61.5 million euros, with the Central Pier as the main building project"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/25131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=25131"}],"version-history":[{"count":0,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/25131\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/25133"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=25131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=25131"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=25131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}