	{"id":21557,"date":"2017-02-28T10:24:19","date_gmt":"2017-02-28T09:24:19","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/?p=21557\/"},"modified":"2017-03-08T13:01:05","modified_gmt":"2017-03-08T12:01:05","slug":"navacel-embarks-towers-will-form-part-first-floating-wind-farm","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/","title":{"rendered":"Navacel embarks the towers that will form part of the first floating wind farm"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p>In the Port of Bilbao, the company Navacel has started loading the five towers which will form part of the wind turbine structures of HyWind Scotland Pilot Park, the first floating wind farm which will be located in Scottish waters.<\/p>\n<p>Loading is being carried out from the Navacel quay on the River of Bilbao, and in the first part of the operation, which will last for five days, different sections will be shipped to the Stord Base site in Norway for assembly. Once the towers have been assembled, they will be transferred to the floating wind farm 25 kilometres from the Peterhead-Aberdeenshire coast, where the turbines will be assembled. The remaining shipments are scheduled for mid- and late March.<\/p>\n<p>The turbine towers manufactured by Navacel have a height of 83 metres with a diameter of 7.5 metres at the base and 4.2 metres at the top, where the turbines will be installed. Each tower weighs 620 tons, which explains why it is so complicated to ship them.<\/p>\n<p>HyWind Scotland Pilot Park is a pioneering project: it is the first floating \u00a0\u00a0\u00a0farm for obtaining marine wind power farm, where the structures supporting the turbines are moored to the seabed, rather than placed directly above it. The advantages of such farms lie in the fact that they have less environmental impact on sea beds, lower assembly and installation costs, since they are assembled in part on land, and also the possibility of positioning wind farms at greater marine depths,<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_21559\" aria-describedby=\"caption-attachment-21559\" style=\"width: 535px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg\" rel=\"attachment wp-att-21559\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-21559 size-medium\" title=\"Project cargo\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel-535x357.jpg\" alt=\"Project cargo\" width=\"535\" height=\"357\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel-535x357.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel-150x100.jpg 150w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel-250x167.jpg 250w\" sizes=\"auto, (max-width: 535px) 100vw, 535px\" \/><\/a><figcaption id=\"caption-attachment-21559\" class=\"wp-caption-text\">Project cargo<\/figcaption><\/figure>\n<p>where according to experts, better quality air currents are produced and the energy from these can be better exploited. Located in deep waters between 90 and 120 metres, HyWind Scotland Pilot Park will be operative at the end of this year and supplying power to 20,000 homes.<\/p>\n<p>The project, commissioned by Norwegian company Statoil, was commenced in April last year and Navacel\u2019s scope of works included purchasing of structural materials, the entire manufacturing process of the towers, and the surface treatment process as well as the installation of the electromechanical systems and tower internals including platforms, stairs, lift, lighting, electrical panels and wirings. The company has also procured and installed the external platforms, where two cranes will be installed to allow the lifting of operating vessels.<\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: Navacel embarks the towers that will form part of the first floating wind farm - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/board-directors-approves-haizea-wind-project-will-create-300-jobs\/\" rel=\"prev\">Board of Directors approves Haizea Wind project, which will create some 300 jobs<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/biscay-firefighters-train-future-emergencies-port-bilbao-using-virtual-reality-simulator-one-country\/\" rel=\"next\">Biscay firefighters train for future emergencies in the Port of Bilbao using   virtual reality simulator, the only one in the country.<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorBoard of Directors approves Haizea Wind project, which will create some 300 jobsSiguienteBiscay firefighters train for future emergencies in the Port of Bilbao using virtual reality simulator, the only one in the [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":21559,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-21557","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Navacel embarks the towers that will form part of the first floating wind farm - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Navacel embarks the towers that will form part of the first floating wind farm - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorBoard of Directors approves Haizea Wind project, which will create some 300 jobsSiguienteBiscay firefighters train for future emergencies in the Port of Bilbao using virtual reality simulator, the only one in the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2017-02-28T09:24:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-03-08T12:01:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"Navacel embarks the towers that will form part of the first floating wind farm\",\"datePublished\":\"2017-02-28T09:24:19+00:00\",\"dateModified\":\"2017-03-08T12:01:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/\"},\"wordCount\":399,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/\",\"name\":\"Navacel embarks the towers that will form part of the first floating wind farm - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg\",\"datePublished\":\"2017-02-28T09:24:19+00:00\",\"dateModified\":\"2017-03-08T12:01:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Project cargo\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Navacel embarks the towers that will form part of the first floating wind farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Navacel embarks the towers that will form part of the first floating wind farm - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/","og_locale":"en_US","og_type":"article","og_title":"Navacel embarks the towers that will form part of the first floating wind farm - Port of Bilbao","og_description":"Port of Bilbao AnteriorBoard of Directors approves Haizea Wind project, which will create some 300 jobsSiguienteBiscay firefighters train for future emergencies in the Port of Bilbao using virtual reality simulator, the only one in the [&hellip;]","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2017-02-28T09:24:19+00:00","article_modified_time":"2017-03-08T12:01:05+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"Navacel embarks the towers that will form part of the first floating wind farm","datePublished":"2017-02-28T09:24:19+00:00","dateModified":"2017-03-08T12:01:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/"},"wordCount":399,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/","name":"Navacel embarks the towers that will form part of the first floating wind farm - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg","datePublished":"2017-02-28T09:24:19+00:00","dateModified":"2017-03-08T12:01:05+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2017\/03\/cargapronavacel.jpg","width":1200,"height":800,"caption":"Project cargo"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/navacel-embarks-towers-will-form-part-first-floating-wind-farm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"Navacel embarks the towers that will form part of the first floating wind farm"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/21557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=21557"}],"version-history":[{"count":0,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/21557\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/21559"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=21557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=21557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=21557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}