	{"id":19548,"date":"2016-09-23T09:19:25","date_gmt":"2016-09-23T07:19:25","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/en\/?p=19548"},"modified":"2016-09-23T12:24:21","modified_gmt":"2016-09-23T10:24:21","slug":"extension-works-punta-sollana-breakwater-project-operation","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/","title":{"rendered":"Extension Works on Punta Sollana Breakwater Project in operation."},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p>The Port Authority of Bilbao has completed the works on the Punta Sollana Breakwater extension, which is located in the Port of Bilbao\u2019s industrial zone in the Outer Abra.<\/p>\n<p>The works have taken four years and will especially boost solid and liquid bulks traffic, since the length of the dock has been increased by 330 metres with a minimum 20- metre depth while the area of dock esplanade available now stands at 20,000m\u00b2. The EU has contributed some 3.53 million euros to the works as part of the \u201cEfficient operations and improvement in the environmental performance of the Port of Bilbao\u201d project, Call TEN-T 2012. The Port Authority\u2019s own resources were used to finance the remainder of the already certified 40.11 million euros total cost.<\/p>\n<p>In the construction of the breakwater extension, the Port Authority has incorporated as a technical innovation and also more environmental-friendly, the design and execution of the wave screen as anticipated in the plans using high performance concrete with a density of up to 2.65 t\/m\u00b3. To achieve this, use has been made of the steelmaking slag produced by the recycling of black slag, defined as an industrial by-product generated in steel manufacturing, in the electric arc furnaces in the different steel works in Biscay. In addition, this has enabled the budget execution to be reduced by approximately one million euros with regard to the original budget.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Strategic Works<\/strong><\/p>\n<p>At present, without the above-mentioned works, the Port facilities located in the industrial zone of Punta Ceballos and Punta Lucero Docks are completely occupied except for a plot in Punta Sollana.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<figure id=\"attachment_19550\" aria-describedby=\"caption-attachment-19550\" style=\"width: 535px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg\" rel=\"attachment wp-att-19550\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-19550 size-medium\" title=\"Punta Sollana\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2-535x357.jpg\" alt=\"Punta Sollana\" width=\"535\" height=\"357\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2-535x357.jpg 535w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2-150x100.jpg 150w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg 1200w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2-250x167.jpg 250w\" sizes=\"auto, (max-width: 535px) 100vw, 535px\" \/><\/a><figcaption id=\"caption-attachment-19550\" class=\"wp-caption-text\">Punta Sollana<\/figcaption><\/figure>\n<p>Furthermore, berth exploitation in this zone is on the verge of saturation, and in the case of Punta Ceballos Pier, this is already a reality. Before these works, the breakwater had 350 metres of linear berthing and now it has 680, which means that two vessels can dock simultaneously. In turn, this will boost bulks traffic, particularly solids, such as soy beans imports or quarry stone exports. Forecasts indicate that this improvement in operations, together with the commercial work carried out, will allow the Port of Bilbao to overtake the 4.5million tonnes of solids moved in 2015 and reach 5.8 million in 2020.<\/p>\n<p>The works will also reduce the effects of the north swell which brings about high movements and overflowing on to the Punta Sollana esplanade.<\/p>\n<p>The construction of these 330 new metres of breakwater-pier, which has a useful 60-metre beam, has involved the use of approximately 20,000 eight-ton and 3000 seventy-five-ton concrete blocks. One million cubic metres of filling has been used between 20% of riprap up to 500kgs and 80% of quarry run.<\/p>\n<p><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/ten-t_transeuropean_trasnport_network_logo_en.png\" rel=\"attachment wp-att-18366\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-18366 size-full\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/ten-t_transeuropean_trasnport_network_logo_en.png\" alt=\"ten-t_transeuropean_trasnport_network_logo_en\" width=\"370\" height=\"49\" srcset=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/ten-t_transeuropean_trasnport_network_logo_en.png 370w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/ten-t_transeuropean_trasnport_network_logo_en-150x20.png 150w, https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/04\/ten-t_transeuropean_trasnport_network_logo_en-250x33.png 250w\" sizes=\"auto, (max-width: 370px) 100vw, 370px\" \/><\/a><\/p>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: Extension Works on Punta Sollana Breakwater Project in operation. - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/port-of-bilbao-tours-also-in-summer\/\" rel=\"prev\">Port of Bilbao tours also in summer<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/port-bilbao-present-heavy-cargo-project-experience-houston-exhibition\/\" rel=\"next\">Port of Bilbao to present its heavy cargo project experience at Houston exhibition<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorPort of Bilbao tours also in summerSiguientePort of Bilbao to present its heavy cargo project experience at Houston exhibition<\/p>\n","protected":false},"author":7,"featured_media":19550,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-19548","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Extension Works on Punta Sollana Breakwater Project in operation. - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Extension Works on Punta Sollana Breakwater Project in operation. - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorPort of Bilbao tours also in summerSiguientePort of Bilbao to present its heavy cargo project experience at Houston exhibition\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2016-09-23T07:19:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-09-23T10:24:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/\"},\"author\":{\"name\":\"Bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\"},\"headline\":\"Extension Works on Punta Sollana Breakwater Project in operation.\",\"datePublished\":\"2016-09-23T07:19:25+00:00\",\"dateModified\":\"2016-09-23T10:24:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/\"},\"wordCount\":456,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/\",\"name\":\"Extension Works on Punta Sollana Breakwater Project in operation. - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg\",\"datePublished\":\"2016-09-23T07:19:25+00:00\",\"dateModified\":\"2016-09-23T10:24:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Punta Sollana\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Extension Works on Punta Sollana Breakwater Project in operation.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8\",\"name\":\"Bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g\",\"caption\":\"Bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Extension Works on Punta Sollana Breakwater Project in operation. - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/","og_locale":"en_US","og_type":"article","og_title":"Extension Works on Punta Sollana Breakwater Project in operation. - Port of Bilbao","og_description":"Port of Bilbao AnteriorPort of Bilbao tours also in summerSiguientePort of Bilbao to present its heavy cargo project experience at Houston exhibition","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2016-09-23T07:19:25+00:00","article_modified_time":"2016-09-23T10:24:21+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg","type":"image\/jpeg"}],"author":"Bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/"},"author":{"name":"Bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8"},"headline":"Extension Works on Punta Sollana Breakwater Project in operation.","datePublished":"2016-09-23T07:19:25+00:00","dateModified":"2016-09-23T10:24:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/"},"wordCount":456,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/","name":"Extension Works on Punta Sollana Breakwater Project in operation. - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg","datePublished":"2016-09-23T07:19:25+00:00","dateModified":"2016-09-23T10:24:21+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2016\/09\/sollana-2.jpg","width":1200,"height":800,"caption":"Punta Sollana"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/extension-works-punta-sollana-breakwater-project-operation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"Extension Works on Punta Sollana Breakwater Project in operation."}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/27b7692589244c5fe3dda7b89b9e16a8","name":"Bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0849ca7c8d9b5fa7dedc3509d02923d14d9e25839807403a853da50e934471fc?s=96&d=mm&r=g","caption":"Bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/fernando\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/19548","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=19548"}],"version-history":[{"count":0,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/19548\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/19550"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=19548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=19548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=19548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}