	{"id":16040,"date":"2015-12-03T15:23:28","date_gmt":"2015-12-03T13:23:28","guid":{"rendered":"https:\/\/www.bilbaoport.eus\/en\/?p=16040"},"modified":"2016-06-13T12:15:55","modified_gmt":"2016-06-13T10:15:55","slug":"tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period","status":"publish","type":"post","link":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/","title":{"rendered":"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period"},"content":{"rendered":"<div class=\"show-for-small mobile-breadcrumbs\"><ul class=\"breadcrumbs\"><li class=\"home\"><span property=\"itemListElement\" typeof=\"ListItem\"><a property=\"item\" typeof=\"WebPage\" title=\"Go to Port of Bilbao.\" href=\"https:\/\/www.bilbaoport.eus\/en\/\" class=\"home\" aria-current=\"page\"><span property=\"name\">Port of Bilbao<\/span><\/a><meta property=\"position\" content=\"1\"><\/span><\/li>\n<\/ul><\/div><div class=\"one_half bbcol\">\n<p>The Port Authority of Bilbao has awarded the tender for the first phase of the development works for the Railway Logistics terminal (TELOF in Spanish) at Pancorbo (Burgos), worth 4,527,100 euros with a ten-month completion period, to the Temporary Consortium formed by Rover Alcisa and Cyes Maritime Works.<\/p>\n<p>In this phase, 60,000 of a total terminal surface area of 480,000 square metres will be developed. The rest will be flexibly developed in phases according to the needs and cargo types of those customers wishing to set up in this logistics zone.<\/p>\n<h3>Terminal with Rail Connection<\/h3>\n<p>The Port Authority terminal at Pancorbo has a rail connection and service tracks \u2013 that is, a 750-metre train reception and despatch track together with two electrified shunting tracks for 650 and 100 metre operation, as well as two 750-metre\u00a0long tracks for loading and discharge. The track gauge is\u00a0Iberian, although it can change to international standard.<\/p>\n<p><\/div><div class=\"one_half column-last bbcol\"><\/p>\n<p>The Port Authority invested some 15 million euros in these connection works and the project also received European aid as part of the IBUK-Intermodal Corridor Project.<\/p>\n<figure id=\"attachment_16041\" aria-describedby=\"caption-attachment-16041\" style=\"width: 305px\" class=\"wp-caption alignnone\"><a class=\"thickbox\" href=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16041 size-medium\" title=\"View of the Pancorbo Terminal\" src=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2-305x217.jpg\" alt=\"View of the Pancorbo Terminal\" width=\"305\" height=\"217\" \/><\/a><figcaption id=\"caption-attachment-16041\" class=\"wp-caption-text\">View of the Pancorbo Terminal<\/figcaption><\/figure>\n<p><\/div><div class=\"clear\"><\/div><\/p>\n <div class=\"hide-for-small page-options-container hide-for-print\"> <hr class=\"page-options\"\/> <ul class=\"inline right page-options\"><li><a class=\"bmprint\" rel=\"nofollow\" title=\"Print this article\"><i class=\"icon-print\"><\/i><\/a><\/li><li><a class=\"bmsend2friend\" href=\"mailto:?subject=Article of interest: Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period - Port of Bilbao&body=https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/\" rel=\"nofollow\" title=\"Send a link to this article by email\"><i class=\"icon-envelope\"><\/i><\/a><\/li><\/ul><div class=\"row collapse posts-navigation\"><div class=\"medium-6 columns\"><i class=\"icon-angle-left\"><\/i>Anterior<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/first-port-of-bilbao-stories-competition\/\" rel=\"prev\">First Port of Bilbao Stories Competition<\/a><\/div><div class=\"medium-6 columns alignright\"><i class=\"icon-angle-right\"><\/i>Siguiente<a href=\"https:\/\/www.bilbaoport.eus\/en\/news\/16127\/\" rel=\"next\">Volunteers from Bilbao Port Authority share a day with the disabled<\/a><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Port of Bilbao AnteriorFirst Port of Bilbao Stories CompetitionSiguienteVolunteers from Bilbao Port Authority share a day with the disabled<\/p>\n","protected":false},"author":25,"featured_media":16041,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-16040","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period - Port of Bilbao<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period - Port of Bilbao\" \/>\n<meta property=\"og:description\" content=\"Port of Bilbao AnteriorFirst Port of Bilbao Stories CompetitionSiguienteVolunteers from Bilbao Port Authority share a day with the disabled\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/\" \/>\n<meta property=\"og:site_name\" content=\"Port of Bilbao\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bilbaoport\" \/>\n<meta property=\"article:published_time\" content=\"2015-12-03T13:23:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-06-13T10:15:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"855\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"bilbaoport\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/\"},\"author\":{\"name\":\"bilbaoport\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/5e68595e93ba373e6808a7a2e515aa17\"},\"headline\":\"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period\",\"datePublished\":\"2015-12-03T13:23:28+00:00\",\"dateModified\":\"2016-06-13T10:15:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/\"},\"wordCount\":212,\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/\",\"name\":\"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period - Port of Bilbao\",\"isPartOf\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg\",\"datePublished\":\"2015-12-03T13:23:28+00:00\",\"dateModified\":\"2016-06-13T10:15:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#primaryimage\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg\",\"width\":1200,\"height\":855,\"caption\":\"View of the Pancorbo Terminal\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.bilbaoport.eus\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#website\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"name\":\"Port of Bilbao\",\"description\":\"Port Authority of Bilbao site\",\"publisher\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#organization\",\"name\":\"Bilbaoport\",\"url\":\"https:\/\/www.bilbaoport.eus\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"contentUrl\":\"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png\",\"width\":396,\"height\":200,\"caption\":\"Bilbaoport\"},\"image\":{\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bilbaoport\",\"https:\/\/x.com\/bilbaoport\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/5e68595e93ba373e6808a7a2e515aa17\",\"name\":\"bilbaoport\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/2699c566d36aaa0497b80cd1099c4daddfcba222ae0e94f7a4609ed34082d284?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/2699c566d36aaa0497b80cd1099c4daddfcba222ae0e94f7a4609ed34082d284?s=96&d=mm&r=g\",\"caption\":\"bilbaoport\"},\"url\":\"https:\/\/www.bilbaoport.eus\/en\/author\/bilbaoport\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period - Port of Bilbao","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/","og_locale":"en_US","og_type":"article","og_title":"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period - Port of Bilbao","og_description":"Port of Bilbao AnteriorFirst Port of Bilbao Stories CompetitionSiguienteVolunteers from Bilbao Port Authority share a day with the disabled","og_url":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/","og_site_name":"Port of Bilbao","article_publisher":"https:\/\/www.facebook.com\/bilbaoport","article_published_time":"2015-12-03T13:23:28+00:00","article_modified_time":"2016-06-13T10:15:55+00:00","og_image":[{"width":1200,"height":855,"url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg","type":"image\/jpeg"}],"author":"bilbaoport","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#article","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/"},"author":{"name":"bilbaoport","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/5e68595e93ba373e6808a7a2e515aa17"},"headline":"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period","datePublished":"2015-12-03T13:23:28+00:00","dateModified":"2016-06-13T10:15:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/"},"wordCount":212,"publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/","url":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/","name":"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period - Port of Bilbao","isPartOf":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#primaryimage"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg","datePublished":"2015-12-03T13:23:28+00:00","dateModified":"2016-06-13T10:15:55+00:00","breadcrumb":{"@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#primaryimage","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2015\/12\/Vista-Telof-Pancorbo2.jpg","width":1200,"height":855,"caption":"View of the Pancorbo Terminal"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bilbaoport.eus\/en\/news\/tender-awarded-for-first-phase-of-pancorbo-terminal-development-works-for-4-52-million-euros-with-a-ten-month-completion-period\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.bilbaoport.eus\/en\/"},{"@type":"ListItem","position":2,"name":"Tender awarded for first phase of Pancorbo Terminal development works for 4.52 million euros with a ten-month completion period"}]},{"@type":"WebSite","@id":"https:\/\/www.bilbaoport.eus\/en\/#website","url":"https:\/\/www.bilbaoport.eus\/en\/","name":"Port of Bilbao","description":"Port Authority of Bilbao site","publisher":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#organization"},"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bilbaoport.eus\/en\/#organization","name":"Bilbaoport","url":"https:\/\/www.bilbaoport.eus\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","contentUrl":"https:\/\/www.bilbaoport.eus\/wp-content\/uploads\/2014\/09\/logo_bilbaoport.png","width":396,"height":200,"caption":"Bilbaoport"},"image":{"@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bilbaoport","https:\/\/x.com\/bilbaoport"]},{"@type":"Person","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/5e68595e93ba373e6808a7a2e515aa17","name":"bilbaoport","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bilbaoport.eus\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/2699c566d36aaa0497b80cd1099c4daddfcba222ae0e94f7a4609ed34082d284?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2699c566d36aaa0497b80cd1099c4daddfcba222ae0e94f7a4609ed34082d284?s=96&d=mm&r=g","caption":"bilbaoport"},"url":"https:\/\/www.bilbaoport.eus\/en\/author\/bilbaoport\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/16040","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/comments?post=16040"}],"version-history":[{"count":0,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/posts\/16040\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media\/16041"}],"wp:attachment":[{"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/media?parent=16040"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/categories?post=16040"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bilbaoport.eus\/en\/wp-json\/wp\/v2\/tags?post=16040"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}